Addition
Here are some pictures of the work on the addition to our house by Jill
Mulder and Julie Vogel of New Prairie Construction, 813 West Vine Street,
Champaign, Illinois, 217-344-5131. The house is at 2409 South Vine Street,
Urbana, Illinois.
- The plan.
a-plan.jpg (157140 bytes) [2003 May 21 3:19 GMT]
- The deck is gone, except for a few boards, and the bush has been trimmed
h045.jpg (99512 bytes) [2003 May 22 12:11 GMT]
- The same view from the south.
h046.jpg (142247 bytes) [2003 May 22 12:11 GMT]
- h047.jpg (122811 bytes) [2003 May 22 12:12 GMT]
- Half the hole has been dug, half the patio bricks have been piled up, and Dan is talking to Horacio Porta
h048.jpg (87327 bytes) [2003 May 22 12:12 GMT]
- Same from the south.
h049.jpg (133146 bytes) [2003 May 22 12:12 GMT]
- The footers have been poured
h050.jpg (115716 bytes) [2003 May 22 12:12 GMT]
- Footers, southwest corner
h051.jpg (116745 bytes) [2003 May 22 12:12 GMT]
- Lots of soil
h052.jpg (109444 bytes) [2003 May 22 12:12 GMT]
- Foundation and piers
h053.jpg (119843 bytes) [2003 May 22 12:12 GMT]
- New pvc sewer line and cleanout, replacing the old clay tile line, which was clogged with tree roots at one point
h054.jpg (75095 bytes) [2003 May 22 12:13 GMT]
- New pvc line near the street, in the deepest part of the trench
h055.jpg (93412 bytes) [2003 May 22 12:13 GMT]
- New pvc line inside the footprint of the addition, with old inspection pipe capped h056.jpg (62900 bytes) [2003 May 22 12:13 GMT]
- Matt Halfar, of Halfar Plumbing, putting the dirt back into the trench
h057.jpg (63702 bytes) [2003 May 22 12:13 GMT]
- Matt again, view of foam insulation
h058.jpg (97849 bytes) [2003 May 22 12:13 GMT]
- Access pipe, foundation wall, and footer
h059.jpg (51991 bytes) [2003 May 22 12:13 GMT]
- Matt again. The boards keep the rain out of the cores of the cement blocks, temporarily.
h060.jpg (100016 bytes) [2003 May 22 12:13 GMT]
- Darby, of Halfar Plumbing, putting the dirt back with the dinky shovel
h061.jpg (89368 bytes) [2003 May 22 12:13 GMT]
- Sand in place in the crawlspace h062.jpg (105600 bytes) [2003 May 22 12:13 GMT]
- Central beam in place
h063.jpg (93130 bytes) [2003 May 22 12:13 GMT]
- These bolts will help hold down the room when the tornado comes. The sheet metal keeps the wood from absorbing moisture from the cement
h064.jpg (83461 bytes) [2003 May 22 12:14 GMT]
- The two bolts on the other corner.
h065.jpg (56348 bytes) [2003 May 22 12:14 GMT]
- One of the central piers
h066.jpg (52329 bytes) [2003 May 22 12:14 GMT]
- Carol admiring the crawlspace
h067.jpg (52727 bytes) [2003 May 22 12:14 GMT]
- Erik Paulson and Ben installing floor joists
h068.jpg (112715 bytes) [2003 May 22 12:14 GMT]
- Ben with the pneumatic hammer installing the hangers for the joists. Notice the saw cuts in the old wall, sketching the future access opening.
h069.jpg (74797 bytes) [2003 May 22 12:14 GMT]
- The floor is done h070.jpg (89537 bytes) [2003 May 22 12:14 GMT]
- Northwest corner of walls
h071.jpg (54232 bytes) [2003 May 22 12:14 GMT]
- The rest of the house
h072.jpg (73306 bytes) [2003 May 22 12:14 GMT]
- Three walls
h073.jpg (104449 bytes) [2003 May 22 12:14 GMT]
- South wall meets old h074.jpg (67842 bytes) [2003 May 22 12:14 GMT]
- Bolt from wall will be joined with Simpson HD-2A anchor. South wall.
h075.jpg (58530 bytes) [2003 May 22 12:14 GMT]
- Anchor bolt, west wall, south end
h076.jpg (63150 bytes) [2003 May 22 12:15 GMT]
- North wall meets old
h077.jpg (42763 bytes) [2003 May 22 12:15 GMT]
- Southwest corner top from inside
h078.jpg (48030 bytes) [2003 May 22 12:15 GMT]
- Southwest corner top from outside.
h079.jpg (58429 bytes) [2003 May 22 12:15 GMT]
- Northwest corner from a distance h080.jpg (119913 bytes) [2003 May 22 12:15 GMT]
- South wall from a distance
h081.jpg (81608 bytes) [2003 May 22 12:15 GMT]
- Windows in west wall framed.
h082.jpg (119587 bytes) [2003 May 22 12:15 GMT]
- Anchor bolt on south wall attached.
h083.jpg (41919 bytes) [2003 May 22 12:15 GMT]
- Plywood on walls h084.jpg (87073 bytes) [2003 May 22 12:15 GMT]
- Simpson anchor plates join wood around window openings in south wall
h085.jpg (87869 bytes) [2003 May 22 12:15 GMT]
- Northern window opening in west wall
h086.jpg (68048 bytes) [2003 May 22 12:15 GMT]
- Anchor bolts attached, northwest corner
h087.jpg (63151 bytes) [2003 May 22 12:16 GMT]
- Anchor bolts attached, northwest corner, close up h088.jpg (64301 bytes) [2003 May 22 12:16 GMT]
- Anchor bolts attached, southwest corner, close up h089.jpg (63180 bytes) [2003 May 22 12:16 GMT]
- Northwest corner from outside
h090.jpg (64088 bytes) [2003 May 22 12:16 GMT]
- Southern wall from inside
h091.jpg (98796 bytes) [2003 May 22 12:16 GMT]
- The metal strap connecting the top plate to the wall, southwest corner.
There's a similar one in the northwest corner.
h093.jpg (75668 bytes) [2003 May 22 12:16 GMT]
- Plastic infiltration barrier installed. h094.jpg (80444 bytes) [2003 May 22 12:16 GMT]
- Harry Buerkett's ingenious funnel system for getting rainwater to flow outside.
h095.jpg (69331 bytes) [2003 May 22 12:16 GMT]
- The rest of the funnel. It looks promising!
h096.jpg (32314 bytes) [2003 May 22 12:16 GMT]
- Unfortunately the rain was accompanied by wind...
h097.jpg (85113 bytes) [2003 May 22 12:16 GMT]
- Our first full dumpster.
h098.jpg (86733 bytes) [2003 May 22 12:16 GMT]
- The trusses arrive.
h099.jpg (92963 bytes) [2003 May 22 12:16 GMT]
- The dumpster being picked up.
h100.jpg (111831 bytes) [2003 May 22 12:08 GMT]
- Julie Vogel and Harry Buerkett carry the front end of a truss. Each one weighs 207 pounds,
except for the gable truss, which weighs 268 pounds.
h101.jpg (123309 bytes) [2003 May 22 12:08 GMT]
- h102.jpg (102001 bytes) [2003 May 22 12:08 GMT]
- Harry Buerkett, Erik Paulson, and Jill Mulder with a truss.
h103.jpg (107673 bytes) [2003 May 22 12:08 GMT]
- Leighton Tiger and Jill Mulder.
h104.jpg (70394 bytes) [2003 May 22 12:08 GMT]
- h105.jpg (41018 bytes) [2003 May 22 12:08 GMT]
- h106.jpg (81955 bytes) [2003 May 22 12:09 GMT]
- h107.jpg (84335 bytes) [2003 May 22 12:09 GMT]
- h108.jpg (72125 bytes) [2003 May 22 12:09 GMT]
- Every joint is caulked.
h109.jpg (82516 bytes) [2003 May 22 12:09 GMT]
- h110.jpg (63822 bytes) [2003 May 22 12:09 GMT]
- The new airconditioner. h111.jpg (95748 bytes) [2003 May 22 12:09 GMT]
- The new airconditioner.
h112.jpg (76829 bytes) [2003 May 22 12:09 GMT]
- Rain.
h113.jpg (69255 bytes) [2003 May 22 12:09 GMT]
- Rain.
h114.jpg (64931 bytes) [2003 May 22 12:09 GMT]
- Rain.
h115.jpg (73475 bytes) [2003 May 22 12:09 GMT]
- The rafters over the old roof.
h116.jpg (61841 bytes) [2003 May 22 12:09 GMT]
- h117.jpg (50046 bytes) [2003 May 22 12:09 GMT]
- h118.jpg (65532 bytes) [2003 May 22 12:10 GMT]
- The trusses, viewed from the end of the gable.
h119.jpg (80465 bytes) [2003 May 22 12:10 GMT]
- h120.jpg (47995 bytes) [2003 May 22 12:10 GMT]
- Harry Buerkett on the roof.
h121.jpg (46241 bytes) [2003 May 22 12:10 GMT]
- Harry Buerkett on the roof, after hearing this picture would be on the web.
h122.jpg (22628 bytes) [2003 May 22 12:10 GMT]
- Ben on the roof.
h123.jpg (46243 bytes) [2003 May 22 12:10 GMT]
- Erik cutting the 5/8" plywood for the roof sheathing.
h124.jpg (126313 bytes) [2003 May 22 12:10 GMT]
- Ben unrolling the first roll of 30 pound roofing felt.
h125.jpg (47999 bytes) [2003 May 22 12:10 GMT]
- The bottom layer of felt in the new valley.
h126.jpg (59088 bytes) [2003 May 22 12:10 GMT]
- A Simpson H2-5 anchor holding down the truss by attaching it to the top plates.
h127.jpg (77146 bytes) [2003 May 22 12:10 GMT]
- More truss anchors.
h128.jpg (70882 bytes) [2003 May 22 12:10 GMT]
- The valley fully papered.
h129.jpg (48472 bytes) [2003 May 22 12:10 GMT]
- The roof fully papered.
h130.jpg (77207 bytes) [2003 May 22 12:10 GMT]
- The cutout in old roof between the two attics.
h131.jpg (77288 bytes) [2003 May 22 12:10 GMT]
- The west rake wall, as researched by Harry Buerkett on the web.
h132.jpg (84057 bytes) [2003 May 22 12:11 GMT]
- The east rake wall. Not attached to the truss by any nails, to avoid stresses when the truss flexes in response to changes in temperature.
h133.jpg (77503 bytes) [2003 May 22 12:11 GMT]
- The return air vent in the closet.
h134.jpg (100390 bytes) [2003 May 22 12:11 GMT]
- Nolan and Denny of Rose Heating & Air
Conditioning, here to install the heating ducts. Not pictured are Travis Rose, Steve, and Ryan.
h135.jpg (44545 bytes) [2003 May 22 12:11 GMT]
- The Andersen windows and doors are in.
h136.jpg (98729 bytes) [2003 May 22 12:11 GMT]
- Detail of installation of casement window, showing the Peel & Seal self-stick aluminum membranes, made by MFM Building Products.
Also notice the base support, angled to shed any water.
h137.jpg (49275 bytes) [2003 May 22 12:11 GMT]
- The new interior wall extended to the ceiling. The "Stud Claw" brackets have
a nailing slot to allow the truss to move vertically. Unfortunately they
also have flanges emerging beyond the side of the top plates, originally
desiged to hold the ceiling drywall somewhat away from the trusses, so those
will have to be removed or bent out of the way. [See Stud Claw/USA, 5370
Chestnut Ridge Road Orchard Park, NY 14127 USA tel: 716-662-7877 fax:
716-662-4430.]
h138.jpg (82752 bytes) [2003 May 22 12:11 GMT]
- The new PVC furnace flues in the attic, one for exhaust and one for air
intake. Notice how easy it will be for me to step over them, thanks to the
employees of Rose Heating & Air
Conditioning who repositioned the flues willingly.
h139.jpg (89857 bytes) [2003 May 22 12:11 GMT]
- Peel & Seal membrane as flashing around the casement windows.
h143.jpg (84129 bytes) [2003 May 22 13:24 GMT]
- One of the guys from Hitchins Roofing Company picking up shingles.
h148.jpg (80414 bytes) [2003 May 24 13:45 GMT]
- One of the guys from Hitchins Roofing Company picking up shingles.
h149.jpg (77337 bytes) [2003 May 24 13:46 GMT]
- One of the guys from Hitchins Roofing Company picking up shingles.
h150.jpg (81231 bytes) [2003 May 24 13:46 GMT]
- A sheet of 90 pound rolled roofing material laid along
the northwest alley -- the same thickness as shingles!
h151.jpg (97797 bytes) [2003 May 24 13:46 GMT]
- Shane caulking the joints.
h152.jpg (69847 bytes) [2003 May 24 13:46 GMT]
- A bit of the new flooring in the bathroom with Erik checking the plans.
h153.jpg (55725 bytes) [2003 May 24 13:46 GMT]
- Shingles getting nailed. We're installing GAF Timberline 30 Burnt Sienna shingles.
h154.jpg (91207 bytes) [2003 May 24 13:46 GMT]
- Harry Buerkett and the new pocket door track.
h155.jpg (80945 bytes) [2003 May 24 13:46 GMT]
- The new furnace, air conditioner, and humidifier. The guys from Rose Heating & Air Conditioning
willingly refabricated the sheet metal plenum box on top when it turned out
not to fit exactly; the new one is pictured here.
h156.jpg (33374 bytes) [2003 May 24 13:46 GMT]
- The pocket door track, right hand side.
h157.jpg (64978 bytes) [2003 June 21 16:10 GMT]
- The pocket door track, left hand side.
h158.jpg (71867 bytes) [2003 June 21 16:10 GMT]
- The southward windows and proper vents.
h159.jpg (111695 bytes) [2003 June 21 2:15 GMT]
- Two casement windows. h160.jpg (122189 bytes) [2003 June 21 2:15 GMT]
- Shower basin: Darby of Halfar Plumbing stapling the rubber sheet over the first cement pour, in preparation for the second. h161.jpg (90766 bytes) [2003 June 21 2:15 GMT]
- The shower basin, completely poured.
h162.jpg (74128 bytes) [2003 June 21 2:15 GMT]
- Ceiling cables h163.jpg (127249 bytes) [2003 June 21 2:15 GMT]
- The patio door. The brown vinyl will be painted white.
h164.jpg (74290 bytes) [2003 June 21 2:15 GMT]
- The patio door. h165.jpg (64669 bytes) [2003 June 21 2:15 GMT]
- Audio video cables h166.jpg (87246 bytes) [2003 June 21 2:16 GMT]
- New window in NW bedroom. h167.jpg (49267 bytes) [2003 June 21 2:16 GMT]
- Ceiling audio cables
h168.jpg (90829 bytes) [2003 June 21 2:16 GMT]
- SW bedroom, window out h169.jpg (139245 bytes) [2003 June 21 2:16 GMT]
- Stud placement, bathroom, south wall.
h170.jpg (62949 bytes) [2003 June 21 2:16 GMT]
- Stud placement, bathroom, south wall. h171.jpg (56505 bytes) [2003 June 21 16:09 GMT]
- Stud placement, bathroom, south wall. h172.jpg (41593 bytes) [2003 June 21 16:09 GMT]
- Stud placement, bathroom, south wall. h173.jpg (51906 bytes) [2003 June 21 16:09 GMT]
- Stud placement, bathroom, south wall. h174.jpg (75813 bytes) [2003 June 21 2:16 GMT]
- Stud placement, bathroom, shower corner h175.jpg (71962 bytes) [2003 June 21 2:16 GMT]
- Stud placement, bathroom, shower corner h176.jpg (45505 bytes) [2003 June 21 2:16 GMT]
- Stud placement, bathroom, shower corner h177.jpg (70500 bytes) [2003 June 21 2:16 GMT]
- Insulation and audio cable h178.jpg (74545 bytes) [2003 June 21 2:17 GMT]
- The friendly guys from Armstrong Lumber delivering wall board
h179.jpg (150163 bytes) [2003 June 21 2:17 GMT]
- Insulation, toilet room, west wall
h180.jpg (94551 bytes) [2003 June 21 2:17 GMT]
- Insulation, toilet room, south wall h181.jpg (101533 bytes) [2003 June 21 2:17 GMT]
- Toilet room, south east corner
h182.jpg (91606 bytes) [2003 June 21 2:17 GMT]
- Stud placement, shower area, east wall
h183.jpg (20036 bytes) [2003 June 21 16:09 GMT]
- Stud placement, shower area, east wall h184.jpg (36884 bytes) [2003 June 21 16:09 GMT]
- Stud placement, shower area, east wall h185.jpg (55150 bytes) [2003 June 21 2:17 GMT]
- Jill Mulder, mudder
h186.jpg (25787 bytes) [2003 June 21 16:09 GMT]
- Leighton Tiger, taper h187.jpg (31153 bytes) [2003 June 21 2:17 GMT]
- Harry and Erik installing the Solatube h188.jpg (67162 bytes) [2003 June 21 16:10 GMT]
- Erik adding drywall to closet h189.jpg (48813 bytes) [2003 June 21 2:17 GMT]
- Prest-On Cornerbacks allow the ceiling to be attached to the wall instead of the truss, which may move h191.jpg (19486 bytes) [2003 June 21 16:09 GMT]
- More cornerbacks h192.jpg (28102 bytes) [2003 June 21 2:17 GMT]
- More cornerbacks h193.jpg (21258 bytes) [2003 June 21 16:09 GMT]
- Mud everywhere in the family room h196.jpg (48081 bytes) [2003 June 21 2:18 GMT]
- Once the wall gets painted with
primer
it's hard to photograph.
h197.jpg (36301 bytes) [2003 June 21 2:18 GMT]
- Durock NER-259 cement board and shower basin
h198.jpg (82304 bytes) [2003 June 21 2:18 GMT]
- The Solatubes illuminate the closet, diffusers not installed yet.
h200.jpg (30624 bytes) [2003 June 21 2:18 GMT]
- View of a Solatube from below, diffuser not installed yet.
h201.jpg (61195 bytes) [2003 June 21 2:18 GMT]
- Piers for the deck, south row. h202.jpg (114754 bytes) [2003 June 21 17:32 GMT]
- Piers for the deck, north row. h203.jpg (95323 bytes) [2003 June 21 17:32 GMT]
- Solatube from roof, eastward one.
(The recommended sealant for the flashing is Geocell 3300.)
h205.jpg (165201 bytes) [2003 June 21 17:32 GMT]
- Solatube from roof, westward one. h206.jpg (49601 bytes) [2003 June 21 17:33 GMT]
- Manually removing the extra soil left behind from the excavation.
h207.jpg (135885 bytes) [2003 June 22 17:19 GMT]
- Chris and Russ installing a window where we used to have a back door.
h268.jpg (92919 bytes) [2003 July 11 23:46 GMT]
- Some old rotten wood has been cut away and is about to be replaced. h270.jpg (93020 bytes) [2003 July 11 23:46 GMT]
- Some old rotten wood has been cut away and is about to be replaced. h271.jpg (88863 bytes) [2003 July 11 23:46 GMT]
- Some old rotten wood has been cut away and is about to be replaced. h272.jpg (92071 bytes) [2003 July 11 23:46 GMT]
- The replacement is in place. h273.jpg (75070 bytes) [2003 July 11 23:46 GMT]
- Tiles going in in the bathroom. h274.jpg (40856 bytes) [2003 July 11 23:46 GMT]
- Construction of the deck is begun.
h276.jpg (129229 bytes) [2003 July 11 23:46 GMT]
- The northwest corner of the new deck, joists.
h279.jpg (98866 bytes) [2003 July 11 23:47 GMT]
- All the deck joists are in place. h280.jpg (132107 bytes) [2003 July 11 23:47 GMT]
- Molding being primed.
h281.jpg (65568 bytes) [2003 July 11 23:47 GMT]
- The new cabinet doors on display in the bathroom. The glass inserts
were made by Glass FX, Champaign, Illinois, 217-359-0048.
h282.jpg (118119 bytes) [2003 July 12 21:05 GMT]
- Track lights in place in the family room, installed by Larry Harper of
Martindale and Harper, the electrician for the project.
h285.jpg (32122 bytes) [2003 July 11 23:47 GMT]
- Thin styrofoam panels, Dow High Performance Underlayment, will provide
a smooth surface for the vinyl siding on the north wall of the addition.
h287.jpg (111301 bytes) [2003 July 12 21:17 GMT]
- The first batch of siding.
h288.jpg (105539 bytes) [2003 July 11 23:47 GMT]
- Trex boards installed on the deck. They're made from plastic film for wrapping shipping pallets and sawdust.
h289.jpg (151451 bytes) [2003 July 11 23:48 GMT]
- Close up view of the tiles in the bathroom. The tiles are Porcelanosa
"Helena", the grout is Hydroment SeaBreeze S139, and the small green
glass accent tiles are Transparent
Blue Green F13 Field Tile from Accent Glass Tile in Tigard,
Oregon.
All the grout will be sealed with
Tile, Stone & Grout Penetrating Sealant,
Natural Look Formula, by
ColorFast Industries Inc.
h290.jpg (55083 bytes) [2003 July 12 21:15 GMT]
- One of the glass blocks from Pittsburgh-Corning, Premiere Series, Decora pattern. h292.jpg (60308 bytes) [2003 July 11 23:48 GMT]
- New north facing window in master bedroom, trim painted, walls painted.
h296.jpg (85116 bytes) [2003 July 12 21:03 GMT]
- Floor tile in bathroom and its closet.
h297.jpg (77444 bytes) [2003 July 12 21:01 GMT]
- Floor tile where the toilet and bidet will go.
h298.jpg (70834 bytes) [2003 July 12 21:01 GMT]
- Ceiling fan in place in the family room, installed by Larry Harper of
Martindale and Harper, the electrician for the project.
h301.jpg (114319 bytes) [2003 July 12 21:01 GMT]
- Elegant living on the new deck.
h303.jpg (264078 bytes) [2003 July 19 0:15 GMT]
- Steve Pankau and Tim of Pankau Masonry building the glass block wall for the shower.
h305.jpg (167184 bytes) [2003 July 19 0:15 GMT]
- Erik Paulson demonstrates the new pocket door he's just installed in the bathroom.
h306.jpg (138931 bytes) [2003 July 19 0:15 GMT]
- The first bit of flooring gets installed by the guys from Davis
Flooring. It's red oak, 3/4" thick, made by "superlative brand"
Cumberland Lumber & Mfg. in McMinnville, Tennessee, certified by
NOFMA as "SEL & BTR R.B.",
according to the backs of the boards.
h308.jpg (132257 bytes) [2003 July 19 0:16 GMT]
- One of the strips of metal screwed to the wall and embedded in mortar to hold the glass blocks in place. h309.jpg (116093 bytes) [2003 July 19 0:16 GMT]
- Hit the pneumatic stapler with a mallet to staple the flooring in place.
h310.jpg (155858 bytes) [2003 July 19 0:16 GMT]
- The BB-24 Better Bench by Innovis in the shower, screwed in place.
h312.jpg (174163 bytes) [2003 July 19 0:16 GMT]
- Glass block wall and shower drain. h313.jpg (187537 bytes) [2003 July 19 0:17 GMT]
- Glass block wall and ceiling. The wall is 10 blocks high, and each block is 8 inches.
h314.jpg (178361 bytes) [2003 July 19 0:17 GMT]
- Sliding oak doors on the linen closet in the bathroom.
h315.jpg (119120 bytes) [2003 July 19 0:17 GMT]
- Oak closet door.
h316.jpg (117297 bytes) [2003 July 19 0:17 GMT]
- Red oak AP108 closet door from Appalachian Door (108 Main Street,
P.O. Box 266, Dowagiac, Michigan 49047) stained according to
instructions.
h317.jpg (141170 bytes) [2003 July 19 0:17 GMT]
- Newly finished oak floor.
h318.jpg (55787 bytes) [2003 August 24 20:05 GMT]
- Newly finished oak steps up to the living room.
h319.jpg (72987 bytes) [2003 August 24 20:05 GMT]
- Employees of Hannon Flooring Company cutting the corners off the floor tiles for the bathroom. h320.jpg (129764 bytes) [2003 August 24 20:06 GMT]
- Tiles and poker chip spacers in place on the north wall of the shower area.
h322.jpg (42942 bytes) [2003 August 24 20:06 GMT]
- Better Bench with cement in place.
h323.jpg (43910 bytes) [2003 August 24 20:06 GMT]
- Mark Brown of Smith Siding Company cutting vinyl siding, and Brian Hannon cutting tiles.
h324.jpg (109722 bytes) [2003 August 24 20:06 GMT]
- Siding the north wall.
h325.jpg (80664 bytes) [2003 August 24 20:06 GMT]
- Better Bench tiled.
h326.jpg (45985 bytes) [2003 August 24 20:06 GMT]
- More wall tile in place.
h327.jpg (31792 bytes) [2003 August 24 20:06 GMT]
- Chris cutting something.
h328.jpg (125952 bytes) [2003 August 24 20:06 GMT]
- Suzanne painting trim.
h329.jpg (66608 bytes) [2003 August 24 20:06 GMT]
- Erik Paulson installing the cabinets in the bathroom. h330.jpg (69048 bytes) [2003 August 24 20:06 GMT]
- Erik Paulson installing the cabinets in the bathroom.
h331.jpg (55184 bytes) [2003 August 24 20:06 GMT]
- Suzanne painting trim.
h332.jpg (72441 bytes) [2003 August 24 20:06 GMT]
- A closer look at Erik's cabinets.
h334.jpg (86349 bytes) [2003 August 24 20:07 GMT]
- When will the gutters get installed?
h339.jpg (26402 bytes) [2003 August 24 20:07 GMT]
- A deep puddle. But it'at least it's outside.
h340.jpg (54820 bytes) [2003 August 24 20:07 GMT]
- Siding the south wall.
h342.jpg (164583 bytes) [2003 August 24 20:07 GMT]
- Siding the south wall. h343.jpg (74129 bytes) [2003 August 24 20:07 GMT]
- Siding the south wall. h344.jpg (138716 bytes) [2003 August 24 20:07 GMT]
- Shower fixtures in place.
h345.jpg (16544 bytes) [2003 August 24 20:07 GMT]
- The pile of dirt is finally gone.
h353.jpg (192396 bytes) [2003 August 24 20:07 GMT]
- And so is the other pile of dirt.
h354.jpg (106841 bytes) [2003 August 24 20:07 GMT]
- The new blinds from Smith and Noble open up or down.
h355.jpg (62756 bytes) [2003 August 24 20:08 GMT]
- Deck furniture and planters in place on the new deck.
h356.jpg (115556 bytes) [2003 August 24 20:08 GMT]
- Bathroom mirror in place.
h357.jpg (63052 bytes) [2003 August 24 20:08 GMT]
- Towel bars in place.
h358.jpg (49026 bytes) [2003 August 24 20:08 GMT]
- Shims for installation of carpeting in the bedroom.
h359.jpg (35876 bytes) [2003 August 24 20:08 GMT]